Building the Concept: Architectural Realization
Getting Work as an Architect
Competitions
|
|
Private
Clients / Return Clients
|
|
Request
for Proposal RFPs
The
Proposal document includes:
|
|
Consultants
Consultants
Include:
|
»
Structural Engineer »
Mechanical Engineer »
Electrical Engineer »
Civil Engineer »
Geotechnical Engineer »
Code Consultant |
»
Acoustic Consultant »
Fire Safety Consultant »
Lighting Consultant »
Cost Consultant »
Interior Design Consultant »
Landscape Architect |
Contracts
Stipulated Price Contract
Also
referred to as Competitive Building Contract, or Design/Tender/Bid Contract
Canadian
Construction Documents Committee (CCDC) form #2
The
project proceeds with a full set of working drawings which go to tender
Sub-Trades
bid on various components of the project
Bids
return, and trades are selected (no requirement to select lowest bidder)
Construction
begins and Architect assumes role as mediator between Contractor and Client
Because
the process requires thorough documentation, this method can be slow and
inadaptable to design changes.
-Architect is in direct consultation with the client
-Client is responsible for payment of both the
-Architect and the General Contractor
Architect hires consultants
Cost Plus Contract
Also
referred to as Design/Build Contract
Canadian
Construction Documents Committee (CCDC) form #3
Builder
bills the client on a regular basis for construction materials and labor
The
project can be constructed much more quickly as drawings are prepared as needed
Sub-Trades
are hired directly by Builder, which speeds up bidding process
Client
can isolate party responsible for project directly
Because
the builder is in direct contact with the client, the Architect can lose design
control
Builder
has no supervision on Trade selection can lead to
problems with quality
-General Contractor/builder hired
by client
-General Contractor hires Architect and Consultants
-General Contractor is responsible for the payment of the
parties involved
-Communication between Architect
and Client can be severed
Project Management Contract
Also
referred to as Construction Management Contract
Canadian
Construction Association (CCA) form #5
The
Architect is hired by the Construction Manager to produce a concise set of
construction documents in order to clearly define the scope of construction
This
contract can be used without a General Contractor, where the Construction
Manager would take the role of the General Contractor as well
Incentives
can be provided to the GC for early completion or lowered construction costs
Expensive
to administer as there is an additional party to pay
Construction
manager has relatively little responsibility
-Construction manager is hired by
consultant and acts as a representative to hire Architect and General
Contractor [though in some cases the client hires the Architect]
-All communication is done through the construction
manager, and the construction manager places emphasis on project efficiency
-Architect becomes removed from the client, and the
Construction manager can be at conflict
Development Proposal Contract
Also
referred to as Build-to-Suit or Turn Key Contract
Canadian
Construction Association (CCA) form #14
The
Architect is hired by the Developer to produce a single or multiple sets of
construction documents at the direction of the developer
A
client will lease or purchase directly from the developer before or upon
project completion
Efficient
cost determined construction process with little design related delays
Standard
architectural implementation with no incentive towards innovative building
materials or construction

-The developer is hired by the
client
-The developer is responsible for the hire and payment of
parties involved
-Though the Architect is in direct contact, the developer
often has control over the design
-Projects will tend to be biased towards timely
completion rather than Architectural merit
Design Stages
Concept
Schematic Design
Design
Development
Permits
Site Plan Control Approval
|
National Capital Commission
City of |
Heritage Committee
|
|
Zoning
Variances |
Set-Backs
Easements |
|
Massing of Proposal
Service Connections |
Landscaping / Parking
Waste Removal |
Building Permit
Architectural,
Structural, Mechanical, and Electrical drawings
Numerous
sets given to City for Review
OBC
has precedence over National Building Code
Can
be superseded by Barrier Free Regulations
Issues
of uncertainty will result in a process of clarification and re-submittal
$13.50
for every $1000 of construction costs including the cost of all work regulated
by the Permit including the cost of all material, labor, equipment, overhead
and professional services
»
$10
M Project = $135,000 Building Permit
Project
Requirements
Tender/Bid/Build Method
Thorough
set of drawings which are oriented towards the actual construction of the
project
Wall
Sections / Details / Millwork / Spec / Schedules
Contractors
are invited to bid on project based on drawings and outline spec
Clarifications
to drawings are issued at this point via Addenda
Bids
are submitted and contract is awarded
Detail
drawings from specific trades [misc. metals, millwork, etc.]
Shop
drawings contain minor changes based on shop practices which are to be approved
by architect
Reduced Schedule Method
Developed
at the requirement of the Party in Charge
Depending
on the context, degree of resolution can be quite low
Still
requires co-ordination with consultants
Generally
a minimal amount of architect involvement
Occasionally
required for introductory site visit to introduce the project
Required
bids are submitted and lowest bid is usually accepted
Amount
of shop drawings is usually lessened due to initial involvement with trades
Detail
design is usually constrained as custom detailing is time consuming
Architects Role During Construction
Site
Visits
Responsible
for acting as the representative of the client
Observes
progress and quality of construction, but does not instruct
Errors
and omissions are noted for discussion
Validates
the quality of construction done to date its authenticity to the construction
documents
Notes
the extent of the construction completed, progress noted is legally binding
In
Project Management Contracts, this is usually the responsibility of the Project
Manager
Also
referred to as 95% completion, this developed stage of construction is the
start of product warranties, as well as many insurance clauses
Mediator
In
the design stage the Architect will have to evaluate the viability of the
clients proposal. In the same respect,
the Architect is expected to design within the clients requirements
In
tender stage - the Architect must remain loyal to design decisions and not
allow the project to be altered dramatically by the general contractor
In
the construction stage the Architect will usually face a situation where
there is a dispute between the contractor and the client. The Architect has a legal, ethical obligation
to side with the correct party, not necessarily the client.
Change Orders
Mechanical
System interferes with Architectural element
Product
Spec is no longer available
Price
of material changes after tender
Design
change by Client
Before
a Change Order [CO] is issued it must be approved
The
General Contractor will ask for clarification Request For Information [RFI]
The
RFI will be answered by the appropriate consultant via Contemplated Change
Notice, or [ASK, ASI, MSK, ESK, SSK]
Once
the cost implications are examined by the client, a CO will be issued
COs
are expensive, and should be avoided.
WELL RESOLVED WORKING DRAWINGS